We deliver on our promise.

Our capabilities and products are demonstrated through our project record.

Featured Projects:

Featured Projects

“Our clients experience us as a valued partner; professional, convenient and trustworthy.”

– Sam Pemble, Project Manager

One of Australia's most ambitious projects.

3 months in 20 seconds

Project: Roy Hill

Length: 53m

Total weight: 150,000kg

Transported in 3 sections (heaviest section: 70,000kg)

Project review:

This was the most ambitious switchroom builds in Australia, and certainly in the world. Over the course of 3 months, significant, never-been-done-before engineering solutions were executed. The massive heat loads in some sections needed specialised HVAC engineering. We also worked out how to pre-install the Switchgear, so the new plant was operational in record time when delivered.

Newman Switchboard Upgrade

MANUFACTURING LOCATION

Perth, Western Australia

SCOPE

Design, manufacture and testing 4 415V IP66 Power Distribution Panels (PDPs), 1 415V IP54 PDP inside a custom in-house fabricated outer kiosk and 2 Generator Connection Boxes.

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

Our Moducell IP66 switchboard enclosures were perfect for this brownfield site project. With its double skinned modular design, we managed to minimise the footprint for this switchboard replacement project where space constraints were a major consideration.

In many cases, the Mayfield team were ahead of the curve, through utilising inner and outer doors of the IP66 with mechanical interlocking to create several layers security meeting restricted access and isolation requirements. Our in-house sheetmetal fabrication capability also allowed us to customise the Outer Kiosk and Generator Connection Boxes and control delivery timescales to the customer specific needs.

Brockman 2 Electrical Infrastructure Replacement

MANUFACTURING LOCATION

Perth, Western Australia

SCOPE

415V Moducell double-sided MCC’s, purpose-built PLC’s, VSD and remote switching panels, outdoor enclosures and transportable switchrooms.

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

This brownfield project came with inherited challenges for design restrictions and time pressure. It’s clear that Mayfield’s expertise easily accounted for multiple finer details, which all added up to a smooth installation.

The close collaboration between both teams, working side-by-side value engineering from early design through to final installation prevented costly errors, facilitated clear exchange of knowledge and made this project a great success.

Tom Price - Phase 1 Switchgear Replacement

MANUFACTURING LOCATION

Perth, Western Australia

SCOPE

Design, manufacture and testing of 5 brownfield substation equipment replacements. This includes 415 MCC’s, PLC’s, Remote Switching, Battery Chargers, UPS systems and DB’s.

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

The team from Mayfield understood from the outset that we had to achieve a tight program, the first part of which included delivery of 415V MCC and PLC within 12 weeks of award – we are pleased to say we met every single shutdown window deadline.

This 30-year old site was found to require engineering solutions that would ensure the installation of our retrofit equipment would meet current compliance requirements. Bespoke sliding doors for the PLC enclosures, intelligent shipping splits and clear communication across stakeholders streamlined the entire project process and created a great outcome. The client was very pleased with the results of phase 1 and we are now working together on a much larger phase 2.

Talinga-Orana Gas Field

MANUFACTURING LOCATION

Adelaide, South Australia

SCOPE

Design, supply, integration, testing and commissioning of 3 switchrooms. Comprising of 33kV and 11kV Switchgear, VSDs, 415V MCCs, PLC and Communications systems.

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

The convoy encountered strong winds and poor visibility from dust during the 1,800km journey. Thanks to the high quality packaging and loading at the factory, the Train 1 & 2 Switchroom buildings arrived in perfect condition at the Talinga-Orana Gas Field just outside Chinchilla (300km west of Brisbane). The project included design, supply, integration, testing and commissioning of 33kV and 11kV Switchgear, VSDs, 415V MCCs, PLC and Communications systems. The execution of the project, despite mother nature’s best efforts proved to be flawless.

Canberra Light Rail

MANUFACTURING LOCATION

TBC

SCOPE

TBC

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

TBC

Snapper Mineral Sands

MANUFACTURING LOCATION

TBC

SCOPE

TBC

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

TBC

Westconnex

MANUFACTURING LOCATION

TBC

SCOPE

TBC

POST PROJECT FEEDBACK AND CUSTOMER SATISFACTION

TBC

Contact


About our Services and Turn-Key Solutions

Business Enquiries T: +61 8 8169 1000 E: enquiries@mayfieldindustries.com.au

South Australia Office 3 Gidgie Court, Edinburgh, SA. 5111
T: +61 8 8169 1000

Western Australia Office 12 Possner Way, Henderson, WA. 6166
T: +61 8 8169 1080

Queensland Office Suite 11A, Portal East. 2994, Logan Road, Underwood QLD. 4119
T: +61 7 3036 2740

 

Third-party Accreditation